CY 2015 DSWD Overall Assessment Report
In 2014, the Unified Results-based Monitoring and Evaluation System (URBMES) was installed through the issuance of Memorandum Circular No. 4. The URBME System was developed in response to the pressing need of a results-based and a Department-wide M&E System for assessing the performance of the Department of Social Welfare and Development.
![](https://pdpb.dswd.gov.ph/wp-content/uploads/2019/05/CY2015-Assessment-Report.jpg)
Download here
CY 2015 DSWD Overall Assessment Report